Back to Treasure State Concrete, Inc.

For non-account customers

Non-account customer acknowledgment

Identify the mandatory customer-supplied ground guide, walk the truck route, and review utilities, sprinkler and irrigation systems, septic tanks, septic lines and drain fields, other underground and surface hazards, overhead clearance, ground support, the owner-approved washdown or containment plan, fresh-concrete timing, progressive placement responsibilities, delivery responsibilities, and material conditions for an order already confirmed separately with dispatch. Complete this page and keep a copy for your records. This page is not an order form.

Questions? Call (406) 883-8061
Important

This acknowledgment works alongside current quotes, delivery tickets, and written sales terms. Contact Treasure State Concrete, Inc. before signing if anything is unclear or does not match your separately confirmed delivery.

Customer

Enter the customer and jobsite details for an order already confirmed separately with dispatch.

Review

Read every delivery and material condition.

Sign

Your typed name and date acknowledge all terms; they do not place or change an order.

Treasure State Concrete, Inc.

Customer and jobsite information

Required · Version 2026-08-21-R2

This is not an order form

Submitting this acknowledgment does not order or request materials or services; change or cancel an order; accept pricing; reserve delivery; or authorize delivery. Treasure State Concrete, Inc. dispatch separately confirms all orders, pricing, quantities, products, delivery dates, and delivery authorization.

Customer and jobsite information

Read each item

Delivery and material acknowledgments

Walk the route, describe known hazards above, and read every statement. Contact dispatch before signing if any statement does not match your separately confirmed order or jobsite.

Truck access and site risks

Walk the entire route from the maintained public road to the setup or unloading point before checking these items. Customer directions never override the driver’s safety judgment.

Route, room, and trafficI have inspected, or arranged for someone familiar with the site to inspect, the complete truck route. I will provide adequate width, height, turning and backing room, grade, gates, and traffic control for a fully loaded truck, and I will keep people, pets, vehicles, equipment, and stored materials clear of the travel and unloading area.
Underground and surface hazards or itemsI will identify, clearly mark, and disclose before delivery all known or reasonably suspected underground and surface hazards or items within my knowledge or control that could be damaged by the truck or could damage, disable, or immobilize the truck. These include public or private water, sewer, gas, electric, and communication utilities; sprinkler heads and irrigation lines; septic tanks, septic lines, and drain fields; wells, culverts, vaults, old trenches, recent excavation, uncompacted fill, and concealed structures; and holes, stumps, rocks, debris, drop-offs, curbs, landscaping, parked vehicles, equipment, pavement edges, weak slabs or driveways, and other surface hazards or property. I understand public utility marks may not identify private or customer-owned facilities, and I will check with the property owner or project representative.
Overhead and side clearanceI will identify and disclose low branches, overhead power or communication lines, wires, rooflines, eaves, gates, fences, signs, scaffolding, and other overhead or side obstructions. I understand overhead power lines must be treated as energized. I will not direct a truck beneath, beside, or near an obstruction unless the driver determines there is adequate clearance for the vehicle and any operating equipment.
Ground support and changing conditionsI understand that ground supporting a pickup or passenger vehicle may not support a fully loaded concrete or material truck. I have considered soft, wet, thawing, recently excavated, filled, undermined, or uncompacted soil; lawns, shoulders, slopes, ditches, pavement edges, driveways, culverts, bridges, and slabs; and weather or site changes that could weaken the route, setup area, or unloading point. I will notify dispatch if conditions change.
Mandatory customer-supplied ground guide and driver stop authorityTreasure State Concrete, Inc. policy requires me to provide one designated adult ground guide identified on this form before a company truck leaves a maintained public road or enters, backs, maneuvers, unloads, spreads, or exits the jobsite delivery area. Before movement begins, the ground guide and driver will confirm the planned route, known hazards, worker-free area, communication method, and agreed hand signals. The ground guide will wear high-visibility apparel; remain continuously visible to the driver from a safe position outside the vehicle's path, blind areas, and pinch points; watch for people, vehicles, structures, utilities, overhead or concealed hazards, unstable ground, and property that could be damaged; and perform no unrelated task or use a phone, headphones, or other distraction while guiding. Only the designated ground guide may give routine movement directions, although anyone may signal an emergency stop. The driver retains control of the truck, may reject any direction, and will stop immediately if contact with the ground guide is lost, communication is unclear or conflicting, or conditions appear unsafe. Movement will not resume until safe communication and conditions are reestablished. If a compliant ground guide or safe route is not available, the driver may remain at a safe staging point, stop, delay, relocate, or refuse the requested movement or delivery.
Truck inspection, repair, recovery, towing, and property damageI understand that contact with an unmarked or undisclosed hazard, travel over an unsafe customer-selected route, or movement based on customer or ground-guide directions may damage or immobilize a truck and may require inspection, repair, towing, or qualified heavy recovery. To the extent caused by (1) my failure to disclose or mark a known or reasonably suspected hazard within my knowledge or control, (2) an unsafe route, setup area, or unloading area that I select, request, approve, or direct, or (3) a direction given by me or my ground guide, I will pay Treasure State Concrete, Inc.'s reasonable, documented truck inspection, repair, towing, and recovery costs resulting from that cause. I remain responsible for resulting property damage, delay, returned-material charges, or other charges only to the extent caused by the same act or omission and allowed by applicable law and the controlling written terms. I will not attempt to pull or recover a stuck truck with site equipment unless Treasure State Concrete, Inc. authorizes the recovery plan. This obligation applies only to the extent of that causal responsibility. Treasure State Concrete, Inc. remains responsible to the extent a loss is caused by its own negligence or misconduct. Nothing in this acknowledgment waives any right or responsibility that may not lawfully be waived.

Confirmed-order and material conditions

Review the delivery responsibilities and material limitations that apply only after an order has been confirmed separately with dispatch.

Final order verification before production or deliveryBefore pickup, loading, or delivery—and, for ready-mix, before batching begins—I will verify the product or mix, intended use and specification, quantity, additives or admixtures, color, delivery or pickup address, unloading or placement method, schedule, and all special instructions. I will report corrections before production or loading begins. Phone quantities and pricing may be estimates until confirmed on the applicable written quote, order, or delivery ticket.
Delivery responsibility and chargesI accept responsibility for ordered material that is delivered or placed as I direct, subject to the applicable written quote, delivery ticket, sales terms, and rights that may not lawfully be waived. I understand that delays, rejected access, standby time, returned material, cleanup, recovery, or towing may result in additional charges when allowed by those terms.
Ready-mix batching, hydration, and timeI understand ready-mix concrete cannot be unbatched. When cement, water, and the other materials are combined during batching and mixing, hydration—the chemical reaction that leads to stiffening, setting, and hardening—begins. Normal waiting at the plant, in transit, at the jobsite, or in the truck does not pause or reset that process. Temperature, mixture proportions, approved admixtures, travel, and handling can change the rate, so no fixed working time is promised. I will have the site, access, crew, forms, equipment, and placement plan ready before the truck arrives and will communicate delays immediately. Once Treasure State Concrete, Inc. begins batching concrete to the verified order, production is committed and the customer is responsible for the order and applicable charges under the controlling written terms, even if the site, crew, access, schedule, or requested quantity later changes. This does not require the customer to accept nonconforming material or waive any right that may not lawfully be waived.
Concrete washdown and containmentIf my order includes ready-mix delivery or concrete pumping, I will provide a designated washdown area on private property that the property owner has approved, or I will arrange a temporary washout tub or other containment option with Treasure State Concrete, Inc. before delivery. I understand washdown is not permitted on streets, shoulders, sidewalks, gutters, rights-of-way, storm drains, ditches, waterways, or any other public property. Availability, placement, capacity, service, and disposal responsibilities for a temporary tub must be confirmed before delivery.
Concrete cracking and shrinkageI understand concrete naturally shrinks and may crack. Treasure State Concrete, Inc. does not guarantee a crack-free result, and control joints reduce but do not eliminate cracking.
Placement pace, strike-off, finishing, and appearanceI understand the receiving crew must be ready before discharge begins. For slabs and other flatwork, concrete should be deposited as near as practical to its final position and the crew should progressively place, consolidate as required, strike off or screed, and initially level manageable sections as placement advances. The crew should not assume that the entire placement can be discharged first and struck off afterward. Later floating and finishing must still be timed to the concrete’s actual bleeding and surface condition and should not be performed over visible bleed water. The appropriate sequence and method depend on the approved plans and specifications, mixture, placement method, weather, and qualified field judgment. Final strength, surface quality, color, and appearance also depend on correct placement, consolidation, finishing, jointing, curing, timing, protection, and site conditions.
Ready-mix supply scopeI understand ready-mix supplied to my requested specification does not include placing, screeding, finishing, curing, saw cutting, testing, or protecting the concrete unless Treasure State Concrete, Inc. separately agrees to that work in writing.
Material characteristics and truck spreadingI understand natural aggregates may vary in color, gradation, shape, and moisture. When Treasure State Concrete, Inc. agrees to truck-spread any delivered material, spreading is approximate. Exact depth, width, location, grade, quantity distribution, compaction, or finished surface is not guaranteed. The driver may stop or decline spreading when access or conditions are unsafe.
Inspection and reportingI will inspect the material and delivery promptly and report a suspected shortage, wrong product, visible defect, or delivery concern to dispatch as soon as reasonably possible and before using the material when practical.

Review before signing

Project guidance available

Treasure State Concrete, Inc. has made the Project Help Center, including its homeowner and DIY guidance, available to help customers plan crew readiness, access, placement, finishing, curing, and aftercare. I acknowledge that I was provided this link and had the opportunity to review the guidance relevant to my project before signing. This resource is general education only and does not replace approved plans and specifications, code requirements, project-specific instructions, or advice from a qualified contractor, engineer, testing agency, or other professional.

Treasure State Concrete, Inc. has made its Ground Guides, Mixer-Truck Blind Spots, and Hand Signals guide available to explain the mandatory customer-supplied ground-guide policy, safe positioning, agreed signals, blind areas, and stop-work rules. I acknowledge that I was provided this link and had the opportunity to review it before signing. The guide supplements, but does not replace, the driver's jobsite briefing, instructions, or safety judgment.

Final confirmation

Agreement and acknowledgment

Your typed signature is the acknowledgment.By typing my full legal name below and submitting or printing this form, I confirm that I have read and agree to all delivery and material conditions above, including the mandatory customer-supplied ground-guide policy, the fresh-concrete timing and placement responsibilities, and the limited causal obligation for reasonable, documented truck inspection, repair, towing, and recovery costs. I acknowledge that the Project Help Center and the Ground Guides, Mixer-Truck Blind Spots, and Hand Signals guide were made available to me before signing and that I had the opportunity to review the guidance relevant to my project. I confirm that the site and any existing order-reference information I provided is accurate, that I disclosed and marked known or reasonably suspected hazards within my knowledge or control, and that I am authorized to acknowledge these conditions for the non-account customer identified here. Submitting this acknowledgment does not order or request materials or services; change or cancel an order; accept pricing; reserve delivery; or authorize delivery. Treasure State Concrete, Inc. dispatch separately confirms all orders, pricing, quantities, products, delivery dates, and delivery authorization. I understand this page does not replace the final quote, order, delivery ticket, approved plans and specifications, or other written sales terms. Nothing in this acknowledgment waives liability to the extent caused by Treasure State Concrete, Inc.'s own negligence or misconduct, or any right or responsibility that may not lawfully be waived. Review the ground-guide safety guide before signing.
Typing a name records the signer's stated acknowledgment for the email or printed copy. It does not by itself guarantee legal enforceability.
Orders require separate dispatch confirmation

Submitting this acknowledgment does not order or request materials or services; change or cancel an order; accept pricing; reserve delivery; or authorize delivery. Treasure State Concrete, Inc. dispatch separately confirms all orders, pricing, quantities, products, delivery dates, and delivery authorization. Dispatch may contact you about quantities, product specifications, access, timing, payment, or additional ticket and order terms. For help, call (406) 883-8061 or email our office team.

Submitting asks WordPress to hand this acknowledgment off by email to our office team. A success message confirms only that WordPress accepted the handoff, not that an office inbox received it, and includes a delivery reference. The completed acknowledgment is not saved in the website database. Print or save a PDF if you want a copy.